Wednesday, 14 December 2011

Production day 11, 12, 13

The editor said the titles were not the same colour so i had to redo the font. After i helped Mel edit and caught up on blog posts

Friday, 9 December 2011

Production day 10


Today i finished the end sequence the font for the first sequence. It was difficult because it was a hard font to find but finally found it on urban font.com , we also have some sfx's.

Wednesday, 7 December 2011

PRODUCTION DAY 8 AND 9

Although all the filming has finished i can not start doing the title sequence until the editor has given me the screenshot to put into photoshop. I tried to find some sfx's on the internet of heavy breathing but alot of them sounded to sexual or to slow then when i did find one alot of them you have to pay for so we will be recording me running to get a realistic breathing sound. We found a good sound effect but it can be embedded but not downloaded. 100 Sound Effects Vol 1 - 06 - Heavy Breathing & Heartbeat - Madacy Music Group Inc.

Powered by mp3skull.com

Monday, 5 December 2011

PRODUCTION DAY 7

Kaylee was back and we had one day to film everything so the pressure was on we went out to film the whole clip although it was a short time we managed to film it fluently and it looked good.

PRODUCTION DAY 6

The day after the strike Kaylee was ill so we had to film the scenes where she was not needed like the opening sequence and the kidnapping scene. We found it difficult because we kept tripping over tree stumps.
We changed between point of view and standard camera shots.

PRODUCTION DAY 5


We uploaded and put clips in order and produced our rough cut to show steve. By the end of the day we decided to scrap the whole film and start from scratch because we kept changing clothing and there was not enough detail for the film given and there was a strike on wednesday which meant we had 2 days to film.

PRODUCTION DAY 4

We got into more detailed filming and  started to plan the opening sequence which is a point of view running shot.

PRODUCTION DAY 3

We started to edit the first scene for the rough cut and see what we needed to improve on but it looked good so we decided to keep the footage to go in our film. Wee carried on acting the first scene and tried to do some more intricate camera shots.

PRODUCTION DAY 2

We tested the equipment we were using and started to do a rough copy of the first scene. We found out that the sun was ruining our shot because a ray of light was cutting into the camera so we could not see Mel so we had to get a number of camera attachments that block the sun.